Initiative Text & Signature Gathering Material

THE 80% RENEWABLE ELECTRICITY BY 2050 AND
DISPLACED FOSSIL FUEL WORKER INITIATIVE WAS CALLED I-180 IN 2016–THE UPDATE WILL BE ASSIGNED A NEW NUMBER

FOLLOW THE LINKS BELOW TO GET MATERIAL TO GATHER SIGNATURES BY JUNE 22, 2018, TO PUT THE INITIATIVE ON THE NOVEMBER BALLOT,  OR
TO SEE THE COMPLETE (6/5/2017) INITIATIVE TEXT .

Click here to download: Initiative signature page when it becomes available
Click here to download: Instructions for signature gatherers
Click here to download: EXPLANATION OF INITIATIVE

Click here to download affidavit of signature gatherer:

Affidavit-of-Petition-Signature-Gatherer (WHEN AVAILABLE)

The above documents are all you need to start gathering signatures among your friends. Call me 406-696-2842 or email me rd@mtcares if you have questions.

Location of Montana Wind Turbines
These locations of Wind Turbines can be expanded to coal counties and other areas to bring renewed prosperity there too.

To support the Initiative by showing you welcome the transition to 80% renewable electricity by 2050, please click HERE and fill out the form telling us to contact you with the required paper version of the Initiative for you to sign.

Click here to download voter registration cards:
voter registration application

Click here to download request to withdraw signature from petition:
Request-for-Withdrawal-of-Petition-Signature

Click here to download slide show training for signature gatherers:
Rights-and-Responsibilities-of-Signature-Gatherers-edited

Page last updated 6/6/2017

Home of Montana (MT) Community Affordable Renewable Energy Saves; Paid for by MTcares, Inc., Pam Ellis, Treasurer, Billings MT 59105